Project Performance Report
Performance Table for Expansion Joints of Pressure Steel Pipes in Hydropower Stations
Engineering Project | Main Product Parameters | Type and Application Scenarios | |
Xinjiang Horgos Main Canal Hydropower Station | Flow diameter: 2.4 m Design head: 150 m Axial compensation: ± 100mm horizontal compensation: ±50mm Lateral compensation: ± 10mm Angular Compensation: 0.5° | Structural Type: Double Expansion Joint Application: Exposed piping | |
Yunnan Baoshan West-to-East Water Diversion Project | Flow diameter: 1.0 m Design head: 350 m Axial compensation: ± 80mm horizontal compensation: ±20mm Lateral compensation: ± 0 mm – Angular Compensation: 0.5° | Structural Type: Single Expansion Joint Application: Exposed piping | |
Hetao Hydropower Station in Hejia County, Hunan | Flow diameter: 2.5 m Design head: 50 m Axial compensation: ± 80mm horizontal compensation: ±0mm Lateral compensation: ± 0 mm Angular Compensation: 0° | Structural Type: Single Expansion Joint Application: Exposed piping | |
Xinjiang Xiatag River Mountain Pass Hydropower Station | Flow diameter: 2.8 m Design head: 250 m Axial compensation: ± 80mm horizontal compensation: ±0mm Lateral compensation: ± 15mm angular compensation: 0.5° | Structural Type: Double Expansion Joint Application: Exposed piping | |
Huaihua City Tuokou Hydropower Station | Flow diameter: 4.5 m Design head: 110 m Axial compensation: ± 60mm Horizontal Compensation: ±25mm Lateral compensation: ± 25mm angular compensation: 0.5° | Structural Type: Double Expansion Joint Application: Exposed piping | |
Baoshan Biaozhang River Hydropower Station | Flow diameter: 0.7 m Design head: 400 m Axial compensation: ± 100mm horizontal compensation: ±0mm Lateral compensation: ± 0 mm angular compensation: 0° | Structural Type: Single Expansion Joint Application: Exposed piping | |
Kaqun Third-Grade Hydropower Station in Xinjiang | Flow diameter: 2.8 m Design head: 350 m Axial compensation: ± 80mm horizontal compensation: ±0mm Lateral compensation: ± 0 mm angular compensation: 0° | Structural Type: Single Expansion Joint Application: Exposed piping | |
Myanmar Nam Kheu Hydropower Station | Flow diameter: 4.4 m Design head: 150 m Axial compensation: ± 60mm Horizontal Compensation: ±15mm Lateral compensation: ± 15mm angular compensation: 0.5° | Structural Type: Double Expansion Joint Application: Exposed piping | |
Shangbanglang Hydropower Station in Myanmar | Flow diameter: 4.8 m Design head: 110 m Axial compensation: ± 70mm Horizontal Compensation: ±15mm Lateral compensation: ± 20mm angular compensation: 0.5° | Structural Type: Double Expansion Joint Application: Exposed piping | |
Haiya Hydropower Station in Xuyong County, Sichuan | Flow diameter: 2.0 m Design head: 410 m Axial compensation: ± 80mm horizontal compensation: ±0mm Lateral compensation: ± 15mm angular compensation: 0.5° | Structural Type: Double Expansion Joint Application: Exposed piping | |
Sichuan Tubagou Hydropower Station | Flow diameter: 1.3 m Design head: 790 m Axial compensation: ± 60mm Horizontal Compensation: ±0mm Lateral compensation: ± 25mm angular compensation: 0.5° | Structural Type: Double Expansion Joint Application: Exposed piping | |
Mupo Power Station, Zhongshui Sichuan Company | Flow diameter: 3.7 m Design head: 950 m Axial compensation: ± 70mm horizontal compensation: ±25mm Lateral compensation: ± 25mm angular compensation: 1.5° | Structural Type: Double Expansion Joint Application: Exposed piping | |
Tianhu Hydropower Station in Guilin, Guangxi | Flow diameter: 1.4 m Design head: 1220 m Axial compensation: ± 50mm horizontal compensation: ±10mm Lateral compensation: ± 15mm angular compensation: 0.5° | Structural Type: Double Expansion Joint Application: Exposed piping | |
Laoya Village Hydropower Station in Lixian County, Sichuan | Flow diameter: 0.9 m Design head: 530 m Axial compensation: ± 70mm horizontal compensation: ±10mm Lateral compensation: ± 15mm angular compensation: 0.5° | Structural Type: Double Expansion Joint Application: Exposed piping | |
Hunan Sangzhi Jinlong Hydropower Station | Flow diameter: 1.6 m Design head: 350 m Axial compensation: ± 50mm horizontal compensation: ±10mm Horizontal Compensation: / Angular Compensation: / | Structural Type: Single Expansion Joint Application: Exposed piping | |
Wenshan Huayi River Hydropower Station in Yunnan | Flow diameter: 0.8 m Design Head: 890 m Axial compensation: ± 70mm Horizontal Compensation: / Horizontal Compensation: / Angular compensation: 0.5° | Structural Type: Single Expansion Joint Application: Exposed piping | |
Myanmar Shuijin Ann Hydropower Station | Flow diameter: 4.7 m Design head: 160 m Axial compensation: ± 60mm Horizontal Compensation: / Horizontal Compensation: / Angular compensation: 0.5° | Structural Type: Single Expansion Joint Application: Exposed piping | |
Myanmar Bulo Bridge Level 3 Hydropower Station | Flow diameter: 4.8 m Design head: 530 m Axial compensation: ± 70mm horizontal compensation: ±10mm Lateral compensation: ± 15mm angular compensation: 0.5° | Structural Type: Single Expansion Joint Application: Exposed piping | |
Rongdi Hydropower Station in Rongshui County, Guangxi | Flow diameter: 1.8 m Design head: 300 m Axial compensation: ± 50mm horizontal compensation: / Horizontal Compensation: / Angular compensation: 0.5° | Structural Type: Single Expansion Joint Application: Exposed piping | |
Qing Shui River Hydropower Station in Qiaojia County, Yunnan | Flow diameter: 0.8 m Design Head: 890 m Axial compensation: ± 50mm horizontal compensation: / Horizontal Compensation: / Angular compensation: 0.5° | Structural Type: Single Expansion Joint Application: Exposed piping | |
Qinghai Laxiwa Hydropower Station | Flow diameter: 1.8 m Design head: 390 m Axial compensation: ± 50mm horizontal compensation: / Horizontal Compensation: / Angular compensation: 0.5° | Structural Type: Single Expansion Joint Application: Exposed piping | |
Gansu Chengzigou Hydropower Station | Flow diameter: 4.4 m Design head: 350 m Axial compensation: ± 50mm horizontal compensation: / Lateral compensation: ± 25mm angular compensation: 0.5° | Structural Type: Double Expansion Joint Application: Exposed piping | |
Laojungou Power Station, Mengtun River Company, Lixian County, Sichuan | Flow diameter: 1.3 m Design head: 950 m Axial compensation: ± 70mm horizontal compensation: ±25mm Lateral compensation: ± 25mm angular compensation: 1.5° | Structural Type: Double Expansion Joint Application: Exposed piping | |
Lianghong Power Development Co., Ltd. of Ganluo County, Sichuan Province | Flow diameter: 6.0 m Design head: 130 m Axial compensation: ± 60mm Horizontal Compensation: ±20mm Lateral compensation: ± 25mm angular compensation: 1.5° | Structural Type: Double Expansion Joint Application scenario: Implantable | |
Xiaogou Hydropower Station in Kangding County, Sichuan Province | Flow diameter: 1.5 m Design head: 830 m Axial compensation: ± 80mm horizontal compensation: —— mm Horizontal Compensation: — mm angular compensation: — | Structural Type: Single Expansion Joint Application: Exposed piping | |
Cambodia Kilirong No. 3 Hydropower Station | Flow diameter: 1.6 m Design head: 400 m Axial compensation: ± 70mm horizontal compensation: —— mm Lateral compensation: ± 70mm angular compensation: 1.2° | Structural Type: Double Expansion Joint Application: Exposed piping | |
Ili Kashi River Nilke First-Grade Hydropower Station | Flow diameter: 3.6 m Design head: 100 m Axial compensation: ± 100mm horizontal compensation: ——mm Horizontal Compensation: — mm angular compensation: — | Structural Type: Double Expansion Joint Application: Exposed piping | |
Ili Talad Sai Hydropower Station | Flow diameter: 4.0 m, 2.3 m – Design Head: 100 m Axial compensation: ± 20mm horizontal compensation: ——mm Lateral compensation: ± 50mm angular compensation: — | Structural Type: Double Expansion Joint Application: Exposed piping | |
Ili Sariket Hydropower Station | Flow diameter: 3.5 m, 2.0 m – Design Head: 70 m Axial compensation: ± 30mm horizontal compensation: —— mm Lateral compensation: ± 50mm angular compensation: — | Structural Type: Double Expansion Joint Application: Exposed piping | |
Yunnan Lüshui River Hydropower Station | Flow diameter: 1.7 m Design head: 780 m Axial compensation: ± 50mm horizontal compensation: —— mm Lateral compensation: ± 60mm Angular Compensation: — | Structural Type: Double Expansion Joint Application: Exposed piping | |
Shaanxi Yangling Water Supply Project | Flow diameter: 1.2 m Design head: 140 m Axial compensation: ± 20mm horizontal compensation: ——mm Lateral compensation: ± 40mm angular compensation: — | Structural Type: Double Expansion Joint Application scenarios: Exposed piping and direct burial | |
Sichuan Yongning River Fourth-Grade Hydropower Station | Flow diameter: 3.4 m Design head: 180 m Axial compensation: ± 70mm horizontal compensation: —— mm Horizontal Compensation: — mm Angular Compensation: — | Structural Type: Single Expansion Joint Application: Exposed piping | |
Yunnan Baoshan Yidao Bridge Pipeline Water Diversion Project | Flow diameter: 2.8 m Design head: 300 m Axial compensation: ± 170mm horizontal compensation: 30mm Horizontal Compensation: — mm Angular Compensation: —— | Structural Type: Double Expansion Joint Application: Exposed piping | |
Xia Zhi’en Hydropower Station on the Gek River in Shangri-La, Yunnan | Flow diameter: 2.0 m Design head: ≤560 m Axial compensation: ± 70mm horizontal compensation: ±10mm Lateral compensation: ± 45mm angular compensation: 2° | Structural Type: Double Expansion Joint Application scenarios: Exposed piping, settlement zones | |
Shanxi Beizhao Yellow River Diversion Project | Flow diameter: 1.4m Design head: 100m Axial compensation: ± 50mm horizontal compensation: —— mm Horizontal Compensation: — mm Angular Compensation: 3° | Structural Type: Single‑type and double‑type expansion joints Application scenarios: Exposed piping, water diversion steel pipes, geological settlement zones. | |
Flow diameter: 1.8 m Design head: 400 m Axial compensation: ± 50mm horizontal compensation: —— mm Vertical Compensation: — mm Angular Compensation: 3° | |||
Flow diameter: 2.0 m Design head: 250 m Axial compensation: ± 50mm horizontal compensation: —— mm Horizontal Compensation: — mm Angular Compensation: 3° | |||
Shaanxi Laoyu River Hydropower Station | Flow diameter: 1.4 m Design head: 160 m Axial compensation: ± 80mm horizontal compensation: —— mm Horizontal Compensation: — mm angular compensation: — | Structural Type: Single Expansion Joint Application: Exposed piping ,water diversion steel pipe | |
Xinjiang Biedeli Hydropower Station | Flow diameter: 4.2 m Design head: 120 m Axial compensation: ± 75mm Horizontal Compensation: —— mm Horizontal Compensation: — mm Angular Compensation: 3° | Structural Type: Double Expansion Joint Application: Exposed piping | |
Ethiopia FAN Hydropower Station | Flow diameter: 2.1 m Design head: 440 m Axial compensation: ± 25mm horizontal compensation: ±15mm Horizontal Compensation: — mm Angular Compensation: 2° | Structural Type: Double Expansion Joint Application: Exposed piping ,water diversion steel pipe | |
Flow diameter: 2.1 m Design head: 640 m Axial compensation: ± 60mm Horizontal Compensation: ±25mm Horizontal Compensation: — mm Angular Compensation: 2° | Structural Type: Double Expansion Joint Application: Buried Pipe | ||
Shaanxi Ningshan Hydropower Development Co., Ltd. | Flow diameter: 1.6 m Design head: 350 m Axial compensation: ± 60mm Horizontal Compensation: —— Horizontal Compensation: — Angular compensation: — mm | Structural Type: Single‑stage Application: Exposed piping ,water diversion steel pipe | |
Yunnan Tieshu Qiao Hydropower Station | Flow diameter: 4.0 m Design head: 100 m Axial compensation: ± 100mm horizontal compensation: ±80mm Lateral compensation: ± 100mm angular compensation: — | Structural Type: Duplex ,Exposed pipe Application Scenario: Earthquake Rift Zone | |
Yiliang Hydropower Station in Zhaotong, Yunnan | Flow diameter: 1.8 m Design head: 330 m Axial compensation: ± 70mm Horizontal Compensation: —— Horizontal Compensation: — Angular Compensation: — | Structural Type: Single Expansion Joint | |
Shaanxi Heihe Water Diversion Project | Flow diameter: 2.0 m Design head: 150 m Axial compensation: ± 60mm Horizontal Compensation: —— Lateral compensation: ± 30mm angular compensation: — | Structural Type: Duplex , with vibration damping Application: Buried Pipe , installed in front of the volute | |
Gansu Two Units of Heihe Hydropower Station | Flow diameter: 0.8 m Design head: 350 m Axial compensation: ± 60mm horizontal compensation: —— mm Lateral compensation: ± 10mm Angular Compensation: — | Structural Type: Single Expansion Joint Application: Exposed piping , installed in front of the volute | |
Angola Loma U Hydroelectric Power Station | Flow diameter: 1.9 m Design head: 220 m Axial compensation: ± 70mm Horizontal Compensation: —— Horizontal Compensation: — Angular compensation: 1° | Structural Type: Duplex , with vibration damping Application: Tunnel ,Geological Slip Section | |
Kenya Songgao Luo Hydropower Station | Flow diameter: 4.0 m Design head: 350 m Axial compensation: ± 90mm Horizontal Compensation: —— Horizontal Compensation: — Angular Compensation: — | Structural Type: Sleeve Application: Exposed piping | |
Flow diameter: 4.2 m Design head: 350 m Axial compensation: ± 80mm Horizontal Compensation: —— Horizontal Compensation: — Angular Compensation: — | Structural Type: Sleeve Application: Exposed piping | ||
Angola Mabubas | Flow diameter: 2.5 m Design head: 90 m Axial compensation: ± 100mm Horizontal Compensation: —— Lateral compensation: ± 50mm angular compensation: 1° | Structural Type: Duplex , with vibration damping Application: Tunnel ,Geological Slip Section | |
Flow diameter: 2.8 m Design head: 60 m Axial compensation: ± 80mm Horizontal Compensation: —— Lateral compensation: ± 50mm angular compensation: 1° | Structural Type: Duplex Application: Tunnel ,Geological Slip Section | ||
Qingshuihai, Yunnan Engineering Enjia Section | Flow diameter: 2.0 m Design head: 160 m Axial compensation: ± 50mm Horizontal Compensation: —— Horizontal Compensation: — Angular Compensation: — | Structural Type: Single Expansion Joint Application: Exposed piping | |
Yunnan Qingshuihai Project – Successful Section | Flow diameter: 2.0 m Design head: 60 m Axial compensation: ± 50mm Horizontal Compensation: —— Horizontal Compensation: — Angular Compensation: — | Structural Type: Single Expansion Joint Application: Exposed piping | |
Yunnan Qing Shui Hai Project – Dashi Dong Section | Flow diameter: 2.0 m Design head: 30 m Axial compensation: ± 50mm Horizontal Compensation: —— Horizontal Compensation: — Angular Compensation: — | Structural Type: Single Expansion Joint Application: Exposed piping | |
Xicun Section of the Qingshuihai Project in Yunnan | Flow diameter: 2.0 m Design head: 160 m Axial compensation: ± 50mm Horizontal Compensation: —— Horizontal Compensation: — Angular Compensation: — | Structural Type: Single Expansion Joint Application: Exposed piping | |